Saturday, 4 April 2026
Adelaide.news

Latest news from Adelaide

Story of the Day

Full Tram Shutdown and T2D Roadworks to Impact Easter Saturday Travel

AuthorEditorial Team
Published
4 April 2026/05:13
Section
City
Full Tram Shutdown and T2D Roadworks to Impact Easter Saturday Travel
Source: Wikimedia Commons / Author: Ian Threlfall

Easter Saturday Traffic and Transport Overview

Commuters and holiday-makers across Adelaide are advised to prepare for significant service changes this Easter Saturday, 4 April 2026. With the Easter long weekend in full swing, a combination of major infrastructure projects and essential maintenance will impact both public transport users and motorists. While the traditional city rush is absent, local travel for shopping and holiday events will require extra planning.

Full Tram Network Closure

The most significant disruption today is the total closure of the Adelaide Metro tram network. As part of the ongoing Tram Grade Separation Projects, the entire network will be offline until the last service on Monday, 6 April. This affecting the following lines:

  • GLNELG: Moseley Square to the Entertainment Centre.
  • BTANIC: Botanic Gardens to the Entertainment Centre.
  • FSTVL: Moseley Square to Festival Plaza.

To assist commuters, substitute bus services (GLN1 and BTAN1) are operating at a frequency of every 10 minutes during the day and every 15 to 20 minutes in the evening. Passengers should note that Festival Plaza will not be serviced by substitute buses; however, nearby stops on King William Street and North Terrace remain accessible. Allow at least 20 minutes of additional travel time if you are heading to the city or Glenelg.

Major Roadworks and T2D Impact

On the roads, the River Torrens to Darlington (T2D) project continues to reshape the western suburbs. Motorists using South Road should be aware of several key changes:

  • Gallipoli Underpass: The off-ramp between Anzac Highway and Eurilpa Avenue is reduced to a single lane as crews work on widening the ramp. This is expected to cause minor delays for those exiting toward the inner-south.
  • Torrensville Alignment: South Road remains on its shifted alignment between Ashley Street and West Thebarton Road. A permanent "No Right Turn" restriction is in place for northbound traffic turning into West Thebarton Road.
  • Marion Road: Ongoing works at the intersection of Marion Road and Anzac Highway are reaching a milestone today, but lane restrictions remain in place, leading to potential bottlenecks during peak midday travel.

Local Commuter Alerts

In North Adelaide, detours continue on Hill Street and Strangways Terrace due to infrastructure upgrades, which may affect those heading toward the parklands. Additionally, a stop closure at Stop 7 South Road (East side) remains in effect, requiring passengers for routes 721, 721A, and N721 to use alternative boarding locations. With no major AFL matches scheduled at Adelaide Oval today, city traffic should remain manageable outside of the localized construction zones.